- For Phillips screws
- Stainless Steel Bits
- Solution to the extraneous rust problem: fasten stainless screws with stainless tools
- Vacuum ice-hardened
- Torsion design against premature wear
Application:Phillips screws
Drive:1/4 hexagon. special torsion-style design to reduce premature wear. Take it easy tool finder: Output colour coding (red = Phillips) and large stamp to enable the desired bit to be easily located.
Includes:
- 3851/1 TS bits. stainless. PH 2 x 25 mm
A versatile spot products item suitable for everyday use.







